Every fabrication shop reaches a point where mobile cranes and manual rigging stop keeping up. For this Ahmedabad client, that point came when job volumes grew but the lifting setup did not. Arvex Cranes designed, built and commissioned a double girder EOT crane that fixed the bottleneck in 35 days. Here is how the project went, step by step.
Project at a glance
- Client type: Structural steel fabrication unit
- Location: Changodar GIDC, Ahmedabad
- Equipment: 10-Ton Double Girder EOT Crane
- Duty: Two shifts per day
- Timeline: 35 days
Why a double girder crane?
A single girder crane would have worked for lighter loads. This client handled long beams and heavy welded assemblies every day. A double girder design gave better stability, more hook height and the strength for continuous duty. That made it the right choice for this bay.
How we delivered it?
- Site survey (Days 1-3): Our engineers measured the bay, checked the runway structure and noted the working height and power supply.
- Design and approval (Days 4-9): We shared drawings and specifications. The client approved the span, capacity and control type.
- In-house manufacturing (Days 10-26): We built the girders, end carriages and crab at our own facility. Welding and machining were inspected at each stage.
- Testing and dispatch (Days 27-29): The crane passed a proof load test before leaving our works.
- Installation and commissioning (Days 30-35): Our team installed the crane, aligned the rails, tested every motion and trained the operators.
Client testimonial
“Earlier, we waited for a crane or a rigging crew for every heavy lift. Now the operator picks up the load and moves it directly. The Arvex team stayed with us until every operator was confident.” — Plant Manager, Fabrication Unit, Ahmedabad
Key takeaways
- A custom-built crane matches the bay better than a standard model.
- Proper site measurement before design prevents rework later.
- Operator training is as important as the crane itself.
FAQs
Q: How long does it take to install a double girder EOT crane?
- A: For this project, it took 35 days from site survey to commissioning. The timeline depends on capacity, span and how ready the building structure is.
Q: Is a double girder EOT crane better than a single girder crane?
- A: It depends on the job. Double girder cranes suit heavy loads, longer spans and continuous duty. Single girder cranes suit lighter, less frequent lifting.
Q: Does Arvex Cranes provide operator training?
- A: Yes. We train operators on safe operation and daily inspection during commissioning, and we support the plant after handover.
Q: Can Arvex Cranes build a crane for my plant size?
- A: Yes. We design cranes around your capacity, span, lifting height and duty class. Share these details and our engineers will recommend a solution.
Planning a new crane for your plant? Share your capacity, span and height with our team and get a custom quote with drawings. Call +91 7048667796 or send a WhatsApp inquiry.
⚡ The Material Handling Challenge
The unit was moving steel plates, beams and welded assemblies with a mix of mobile cranes and manual rigging. This slowed every job. Workers spent hours waiting for a free lifting point, and heavy loads moving across a crowded shop floor raised real safety concerns. The management wanted a permanent overhead system that covered the whole bay, handled long structural sections, and could run two shifts a day without constant supervision.