A Vadodara pump manufacturer needed a reliable lifting system for its assembly bay without paying for a motorised crane it would rarely use at full duty. Arvex Cranes built a 5-ton HOT crane in 18 days, and assembly cycles got 33% shorter.
Not every plant needs a motorised crane. Sometimes the best answer is the simplest one. When a pump manufacturer in Vadodara asked us for help with heavy assemblies, we looked at how often they actually lifted, and recommended a hand operated travelling crane. This case study explains why that choice worked and how we delivered it in 18 days.
We asked the client three questions: how many lifts per shift, how heavy, and how far. The answers were a few lifts, up to five tons, and short distances inside one bay. For this duty, a motorised crane adds cost without adding much value. A HOT crane gives the same lifting strength at a lower price, with no power connection and very little maintenance.
Client feedback
“We were ready to buy an electric crane, but Arvex asked how often we lift and suggested a simpler one. It saved us money and works exactly as we need.” — Works Manager, Pump Manufacturing Plant, Vadodara
Not sure which crane suits your duty? Tell us your load, span and number of lifts per shift. Our engineers will suggest the right crane, whether manual or motorised. Call +91 7048667796 or message us on WhatsApp.
Pump casings and motor assemblies weigh between two and five tons, and the assembly team lifted them with a portable gantry that had to be dragged from one bay to the next. Setting it up wasted time, and the wheels often jammed on uneven joints in the floor. The crane would be used only a few times per shift, so the management did not want to spend on a motorised system with higher power load and maintenance cost. They wanted something sturdy, simple and easy for their own staff to maintain.