5-TON HOT CRANE

5-Ton HOT Crane for a Pump Manufacturing Plant in Vadodara

A Vadodara pump manufacturer needed a reliable lifting system for its assembly bay without paying for a motorised crane it would rarely use at full duty. Arvex Cranes built a 5-ton HOT crane in 18 days, and assembly cycles got 33% shorter.

Client: Industrial Pump Manufacturing Plant
Location: Makarpura GIDC, Vadodara, Gujarat
Timeline: 18 Days (Design to Commissioning)
5-Ton HOT Crane for a Pump Manufacturing Plant in Vadodara

📊 Key Operational Impact

5 Ton
Rated Lifting Capacity
33%
Faster Assembly Cycle
Rs. 0
Power Cost for Crane Travel
18 Days
Order to Working Crane

🛠️ Project Narrative & Machinery Specs

Not every plant needs a motorised crane. Sometimes the best answer is the simplest one. When a pump manufacturer in Vadodara asked us for help with heavy assemblies, we looked at how often they actually lifted, and recommended a hand operated travelling crane. This case study explains why that choice worked and how we delivered it in 18 days.

Quick facts

  • Client type: Pump and motor manufacturer
  • City: Vadodara, Gujarat
  • Crane type: 5-Ton HOT crane
  • Operation: Manual hoist and manual travel
  • Delivery: 18 days

Why we recommended a HOT crane?

We asked the client three questions: how many lifts per shift, how heavy, and how far. The answers were a few lifts, up to five tons, and short distances inside one bay. For this duty, a motorised crane adds cost without adding much value. A HOT crane gives the same lifting strength at a lower price, with no power connection and very little maintenance.

What we did, in order?

  1. Bay inspection (Days 1-2): We checked the columns, floor level and clear height.
  2. Drawings and sign-off (Days 3-6): We finalised span, hook height and hoist type with the client.
  3. Fabrication (Days 7-13): We built the girder and end carriages in-house and applied a protective coat.
  4. Load test (Day 14): We tested the crane above its rated load before dispatch.
  5. Installation and handover (Days 15-18): We fitted the runway, installed the crane and trained the team.

What we learned from this project?

  • Match the crane to the real duty, not to the biggest specification.
  • Short, light-duty lifts often do not justify a motorised crane.
  • Staff training on weekly checks keeps a manual crane safe for years.

Client feedback

“We were ready to buy an electric crane, but Arvex asked how often we lift and suggested a simpler one. It saved us money and works exactly as we need.” — Works Manager, Pump Manufacturing Plant, Vadodara

Not sure which crane suits your duty? Tell us your load, span and number of lifts per shift. Our engineers will suggest the right crane, whether manual or motorised. Call +91 7048667796 or message us on WhatsApp.

⚡ The Material Handling Challenge

Pump casings and motor assemblies weigh between two and five tons, and the assembly team lifted them with a portable gantry that had to be dragged from one bay to the next. Setting it up wasted time, and the wheels often jammed on uneven joints in the floor. The crane would be used only a few times per shift, so the management did not want to spend on a motorised system with higher power load and maintenance cost. They wanted something sturdy, simple and easy for their own staff to maintain.

Machinery Specifications

Client / Partner
Industrial Pump Manufacturing Plant
Equipment Type
Pumps, Motors & Fluid Equipment
Installation Location
Makarpura GIDC, Vadodara, Gujarat
Commissioning Time
18 Days (Design to Commissioning)
Technical Build
Custom 5-Ton Hand Operated Travelling (HOT) Crane with Manual Geared Hoist
🚀 Request Free Machinery Quote 💬 Chat on WhatsApp