5-TON SINGLE GIRDER EOT CRANE

Single Girder EOT Crane for an Auto Components Plant in Rajkot

How an auto components plant in Rajkot replaced slow manual die handling with a custom single girder EOT crane, installed by Arvex Cranes in 21 days, and cut die changeover time by 41%.

Client: Auto Components Manufacturing Plant
Location: Aji GIDC, Rajkot, Gujarat
Timeline: 21 Days (Design to Commissioning)
Single Girder EOT Crane for an Auto Components Plant in Rajkot

📊 Key Operational Impact

5 Ton
Rated Lifting Capacity
41%
Faster Die Changeover
12 m
Workshop Bay Span Covered
15 Days
Lost-Time Incidents Since Commissioning

🛠️ Project Narrative & Machinery Specs

In an auto components plant, every minute lost during a die change is lost production. A Rajkot manufacturer was losing too many of them to manual handling. Arvex Cranes designed and built a single girder EOT crane for the workshop and commissioned it in 21 days. Here is how the project worked.

Project at a glance

  • Client type: Auto components manufacturer
  • Location: Aji GIDC, Rajkot
  • Equipment: 5-Ton Single Girder EOT Crane, 12 m span
  • Control: Pendant push button
  • Timeline: 21 days

Why a single girder crane?

The plant lifted dies and fixtures of light-to-medium weight, and its building had limited headroom. A single girder crane is lighter and more compact than a double girder one, so it fits the existing structure without major changes. It also costs less to buy and maintain, which suited this duty.

How we delivered it?

  1. Site survey (Days 1-2): We measured the bay, checked the columns and runway strength, and noted the headroom under the truss.
  2. Design and approval (Days 3-6): We shared drawings and specifications. The client approved the span, capacity and hoist speed.
  3. In-house manufacturing (Days 7-15): We built the girder, end carriages and crab at our facility, with inspection at each stage.
  4. Testing and dispatch (Days 16-17): The crane passed a proof load test before leaving our works.
  5. Installation and commissioning (Days 18-21): Our team installed the crane, aligned the rails, tested every motion and trained the operators.

Client testimonial

“Die changes used to depend on two or three experienced people. Now any trained operator can do it safely, and much faster. The installation was quick and did not stop our production for long.” — Production Head, Auto Components Plant, Rajkot

Key takeaways

  • A single girder crane is the right fit for light-to-medium duty and limited headroom.
  • Two-speed lifting gives the precise control that die handling needs.
  • A short installation window keeps production loss low.

FAQs

1. When is a single girder EOT crane the right choice?

  • A single girder EOT crane is ideal for light to medium-duty material handling in factories, workshops and warehouses. Its compact design, lower installation cost and easier maintenance make it a practical choice for many industrial applications.

2. How long does it take to install a single girder EOT crane?

  • In the referenced project, installation took 21 days from site survey to commissioning. The actual duration depends on lifting capacity, crane span, site readiness and the condition of the runway structure.

3. Can a single girder EOT crane handle precise die lifting?

  • Yes. When equipped with a two-speed electric wire rope hoist, a single girder EOT crane can lift dies efficiently and lower them slowly for accurate positioning during die changeovers.

4. Does Arvex Cranes provide installation and operator training?

  • Yes. Arvex Cranes provides installation and commissioning support, along with operator training and after-sales assistance to help ensure safe and efficient crane operation.

Need a crane for your workshop or production line? Share your capacity, span and height with our team and get a custom quote with drawings. Call +91 7048667796 or send a WhatsApp inquiry.

⚡ The Material Handling Challenge

The plant changed heavy press dies and machine fixtures many times a day. Workers used chain blocks on a fixed beam and a hand pallet truck, so each changeover took long and depended on a few skilled people. Dies were often dragged across the floor, which risked damage to both the die and the operator. As order volumes grew, the plant could not afford this slow, unsafe routine.

Machinery Specifications

Client / Partner
Auto Components Manufacturing Plant
Equipment Type
Automobile & Auto Components
Installation Location
Aji GIDC, Rajkot, Gujarat
Commissioning Time
21 Days (Design to Commissioning)
Technical Build
Custom 5-Ton Single Girder EOT Crane with Electric Wire Rope Hoist and Pendant Control
🚀 Request Free Machinery Quote 💬 Chat on WhatsApp