Arvex Cranes manufactures double girder EOT cranes for steel plants, fabrication units and continuous production lines. With two strong girders and an open winch trolley, it delivers higher lifting capacity, longer spans and greater hook height with stable, precise load control. Load tested before dispatch and supported across India.
A walkway with handrails runs along the girder, so technicians can inspect and maintain the trolley and motors safely at height, without working from unsafe positions.
Hoist and travel brakes hold the load firmly when the crane stops or power is cut. Travel stoppers and buffers at the girder ends protect the crane and runway from impact, and anti-collision devices can be added where multiple cranes share a bay.
An overload limiter stops lifting beyond the rated load, limit switches control hook and travel end positions, and an emergency stop cuts power instantly, which protects heavy loads, the structure and the people below.
Double girder cranes handle ladles, molds, coils, billets, heavy plates and large fabricated structures, with stable load control for demanding, continuous shifts.
Used for turbine and generator maintenance, handling heavy machinery parts, and long span lifting across large plant bays where a single girder is not enough.
Ideal for high-volume loading, stacking and transfer of heavy material across wide spans and tall buildings, with greater hook height and continuous duty operation.
Our engineers check your building columns, gantry or runway girder strength, rail alignment, available headroom and power supply. A safe lifting and erection plan is prepared for the heavy girders before work starts.
The two girders are lifted onto the runway using suitable lifting equipment and joined with the end carriages. The open winch trolley, walkway with handrails, cabling, electrical panel, limit switches and brakes are then fitted and connected.
The crane is tested for hoisting, cross travel and long travel with a rated test load. Brakes, overload limiter and safety devices are checked and calibrated, and your operators are briefed on safe operation and routine inspection before handover.
A: Choose a double girder EOT crane when you need heavier lifting, longer spans, higher hook height or continuous heavy-duty operation. It suits steel plants, foundries, power plants and large production halls where a single girder crane would be under-sized for the duty.
A: A double girder crane has two main girders with an open winch trolley running on rails above them. This design gives more hook height, stable load control, space for a service walkway and better suitability for heavy and long span lifting. Arvex Cranes builds these cranes to your required duty class and plant layout.
A: Yes. Arvex Cranes designs double girder cranes based on your building span, runway layout, lifting height, duty class and working environment. Share your site details with our engineers, and we will prepare a suitable design with a quotation and technical specifications.
A: A double girder crane is heavier than a single girder crane, so your columns, runway girders and rails must be strong and well aligned. Our team checks your structure, headroom and power supply before finalizing the design, and suggests changes only where they are needed.